One-Two-Five Volume 3

Status: Delayed

Art: Delayed - postponed - LFR(Looking for replacement)

Manuscript: Completed - Edited

Print status: Delayed


Just Say You Won't Let Go Volume 1

Status: Completed

Art: Completed

Manuscript: Completed - Edited

Print Status: Active Print - Stock arriving: 7/28/2021


Echoes of Esteria Volume 1

Status: Completed

Art: Completed

Manuscript: Completed - Edited

Print Status: Active Print - Stock arriving: 7/28/2021


Heroes Story Volume 1 Status: In Development

Art: In Development - 60%

Manuscript: Completed - Draft


One-Two-Five Daphne 1/7 scale figure

Status: In Development


3D model: Completed

3D printing: Testing phase

Assembly: Approved(Ease of assembly)

Integrity Test: Failed...Reason: Inability to maintain weight over set amount of time. Leading to tilting, bending, deformation of certain weight-heavy areas.

Change 1: Redistribute connection points.3D file modification + Reprint...Failed

Change 2: Incorporate resin-printed additional supports...Failed.

Change 3: Incorporate steel rod supports to high weight areas. 3D file modification...Failed

Change 4: Upgrade Resin leg support to steel rod support to hold weight from bottom...Test results pending.


Paint: In process.

Attempt 1: Failure. Low paint integrity and durability(easy to damage)

Attempt 2: In-progress. Paint type modified. "Sealing" coat set to be applied.

Quality: Not acceptable - Refining.


Azure Wing Faelan 1/7 scale figure

Status: In Development


3D model: Completed

3D printing: Testing phase

Assembly: Approved(Ease of assembly)

Integrity Test: Failed...Reason: Front heavy design requires additional support under forward-extended leg. Tail weight leads to breaking.

Change 1: Addition of Resin-based support...Failed. Resin support unable to handle total weight, bends dramatically over time. Only slightly delays warping.

Change 2: Tail peg modified into metal rod with 40% more penetration...Test result pending.

Change 3: Resin-based support upgraded to steel rod under leg...Test result pending.